Software delivery

Custom software or off-the-shelf: deciding what fits

Compare what to keep, configure, connect or build using the same workflows, constraints and evidence from a trial.

Build, configure or buy is a business decision before it is a technical one.

Start with the work the business needs to complete. You may be able to keep your main system and configure or connect the missing part. If the gap is material, compare that approach with buying a product or building the specific workflow.

DirectionUseful whenMain trade-off
Retain and improve the processThe gap is contained and the current system remains suitableManual effort and dependencies need to stay visible
Configure an existing platformSupported settings can model the work clearlyConfiguration needs ownership and controlled change
Buy a packaged productYour requirements fit a maintained product and its interfacesYou accept its boundaries, roadmap and exit terms
Build or integrateImportant workflows remain unsupported or span systemsYou need product ownership and sustained engineering support

Describe the gap before comparing products

Map how a real job moves from request to completion. Include approvals, exceptions, integrations and the information users need at each handover. Show the side spreadsheets and inboxes that currently hold the missing steps.

Distinguish an essential requirement from a familiar habit. Some steps deserve to change when better software is introduced. Others protect a customer commitment, regulatory requirement or operating advantage that a standard product must not remove.

Define the result you want to improve: fewer missed handovers, more visible status, less repeated entry or a shorter completion time. Keep these measures available when a demonstration introduces attractive features unrelated to the problem.

Test four realistic directions

A mixed approach is often worth testing: retain the reliable finance or operational core and build only the part that cannot be covered well through configuration or a supported product.

Use the same evidence for each option

Check hard constraints before scoring preferences. These may include access controls, required interfaces, information handling, record export and the capacity to support the system after launch.

Use the two opening scenarios for each shortlisted option. Record demonstrated behaviour, required configuration and remaining workarounds.

An optional comparison sheet can use these criteria:

  • Fit to the essential workflow and exceptions.
  • Ability to connect with systems that must remain.
  • Information control, permissions and auditability.
  • Effort to implement, train, support and change.
  • Portability of data and continuity if the supplier changes.

Agree any weights before the demonstrations. Treat the score as a record of your judgement, not a validated threshold that can select the right product automatically.

Keep requirement, importance, demonstrated evidence, gap, action and owner in the comparison. Use testable wording such as “an approver can return an incomplete request with a reason”.

Distinguish capability from readiness. A feature demonstrated in a vendor's sample environment may still need configuration, data preparation and training for your business. Record that effort in the comparison instead of treating the demonstration as a completed implementation.

Acceptance criteria and readiness checks connect a delivery decision to evidence of usable behaviour.

If a build is needed, define how it will be controlled

Discovery should test the assumptions the plan depends on: workflow fit, external access, data quality and difficult rules. Its outputs should support a decision to proceed, narrow the scope or stop.

Write down the scope, exclusions, acceptance criteria and decision rights. A material change needs an assessment of its effect on timing, testing and other work. Agree support responsibilities and release conditions before deadline pressure makes those discussions harder.

Have the agreement address code, data, documentation, licences for pre-existing components and an exit process. Confirm the legal terms with the relevant advisers rather than assuming payment establishes ownership of everything delivered.

A ScriptStream prescription work queue. The platform was built for Wesley Pharmacy Group’s specialist prescribing workflow.

Use client work as evidence of fit

ScriptStream is an example of a custom build for Wesley Pharmacy Group. Twin built a specialist prescribing workflow with distinct preparation and approval roles and connections to Australian health services.

For your own decision, keep the comparison tied to the workflow that must improve. If a supported product meets it, a build needs a clear additional reason. If no product does, the proposal should explain exactly what will be built, how it will be accepted and who will own it in operation.

Discuss the workflow you need software to support